   OCB/0084/EDTL-EP-2024
   جون 24, 2024
Eletricidade de Timor-Leste Empresa Publica (EDTL-EP)
   PRESENTATION OF THE PROPOSALS AS PER THE DEADLINE FOR THE PROJECT
SELECTION OF SUPERVISION CONSULTANT FOR ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) OF NEW COMORO 150 KV/20 KV SUBSTATION AND TRANSMISSION LINE AT COMORO, DILI
OCB/0084/EDTL-EP-2024


25 June 2024

In accordance with article 76, of Decree Law 22/2022 of the Procurement Legal Regime, the Eletricidade the Timor-Leste, Empresa Pública (EDTL, E.P.) would like to announce, the list of the firms that submitted their proposal within the deadline on 21st of June 2024, as shown in the following:




S. N. Name of Bidder

1. Fase-Estudos e Projectos S.A., R.P.
2. PT. Prima Layanan Enjiniring
3. PT. Ciriajasa Engineering Cosultants in Sub-Consultant with Lituto98 Unipessoal, Lda
4. PT. Rekaya Engineering
5. PT. Hasfarm Dian Konsultan in Joint Venture with PT. Astri Arena and Hilobadi Unipessoal, Lda
6. JV Global Citra Tama – Citra Diecona




Júlio de Jesus Gonçalves
Executive Commissioner of Corporate Services, EDTL, E. P.
   انگلش
   قومی حصولی
   اشاعت شدہ: جون 24, 2024

پتے کی معلومات

   Fransisco Martins
Procurement Specialist
Dili Timor Leste
Dili, Dili
ٹیمور لیسٹی
   +67077298858
   یہاں کلک کریں

سامان ، کام اور خدمات

Additional resources

اصل الفاظ

برائے مہربانی اس بات کو نوٹ کیجیئے کی یہ نوٹس آپ کی معلومات کے لیئے ہے
ہم اس بات کی حت المکان کوشش کرتے ہیں کہ ہماری ویب سائٹ پر سب سے صحیح اور تازہ معلومات فراہم کریں، لیکن ہم اس بات کی ضمانت نہیں دے سکتے کی تمام معلومات غلطی سے پاک ہیں۔
اگر اس نوٹس کے لیئے نئی/تصحیح کے بارے میں آپ کی کوئی رائے ہوں، برائے مہربانی ہمیں ضرور بتائیں۔