تلاش کریں

Water Resources Management Programme VI – Expansion Sewer Network(Lot (1): Construction of around 64 km concrete gravity sewer pipelines (200 mm and 300 mm), concrete manholes and 2376 house connections for Talaa Alnajjar, Fakhif, Furue Hamda, Tabaqat Al Sharqiya, Sahat bin Aziz, Awajan, Tabrbour New and Hay Al bayer Lot (2): Construction of around 46 km concrete gravity sewer pipelines (200 mm), concrete manholes and 1442 house connections for Mughayirat, Muraqab and A'in Rbaat Lot (3) (optional): Construction of one pumping station, around 1 km ductile forcemain line (300 mm), 67 km concrete gravity sewer pipelines, concrete manholes and 2527 house connections for Rajm AlJaysh / Etal Rasifeh)

پروپوزل کی گذارش

عام معلومات

   ستمبر 27, 2025
   انگلش
   دیگر
   اشاعت شدہ: ستمبر 27, 2025

اصل الفاظ

Climate & Nature Stress Test in







Construction of Pumping Stations, Force Main Lines, Gravity Sewer
Pipelines, Manholes and House Connections in South-East Amman

Deadline Extension, Addendum, Prequalification



Sep 25, 2025





CountryJordan


DeadlineOct
08, 2025


FinancingKfW
Entwicklungsbank


Reference NumberBMZ201867944/KfW512693;
WAJ No...
رکنیت کے طریقے

بنیادی

مکمل

کارپوریٹ

$550/سال

$1000/سال

قیمت درخواست پر

خریدنا خریدنا ہمیں رابطہ کریں
برائے مہربانی اس بات کو نوٹ کیجیئے کی یہ نوٹس آپ کی معلومات کے لیئے ہے
ہم اس بات کی حت المکان کوشش کرتے ہیں کہ ہماری ویب سائٹ پر سب سے صحیح اور تازہ معلومات فراہم کریں، لیکن ہم اس بات کی ضمانت نہیں دے سکتے کی تمام معلومات غلطی سے پاک ہیں۔
اگر اس نوٹس کے لیئے نئی/تصحیح کے بارے میں آپ کی کوئی رائے ہوں، برائے مہربانی ہمیں ضرور بتائیں۔