تلاش کریں

(Road-1)Construction Of ...Bc Roadrcc Drain With Footpath Starting From Modern Mour To Ghashipara Bottola Ch. 0+000 To 0+405M & From Modern Mour To Ghagra Khal Via Ghashipara Bottola Ch 0+000 To 0+743M.(Road-2) Construction Of Rcc/ Bc Road Drain With Footpath Starting From Chauliapatty Bottola Mour To Kanchan Bridge Via Sadur Ghat Road From Ch. 0+000 To 0+950M & From Sadur Ghat To Ghagra Khal Via Chauliapatty Bottola From Ch 0+000 To 0+950M Under Dinajpur Pourashavadist.Dinajpur More

معاہدہ حوالے کرنا

عام معلومات

   ستمبر 25, 2025
   انگلش
   دیگر
   اشاعت شدہ: ستمبر 25, 2025

اصل الفاظ

70Ministry of Local Government, Rural Development and Co-operatives and
Local Government Division1124471, Memo.No. 46.02.0000.564.07.055.23.73 Date:15/05/25
(Road-1)Construction of ...BC RoadRCC drain with footpath starting from Modern mour to Ghashipara Bottola Ch. 0+000 to 0+405m & from Modern mour to Ghagra Khal via Ghashipara Bottola Ch 0+000 to 0+743m.(Road-2) Construction of RCC/ BC...
رکنیت کے طریقے

بنیادی

مکمل

کارپوریٹ

$550/سال

$1000/سال

قیمت درخواست پر

خریدنا خریدنا ہمیں رابطہ کریں

Contract award information

   msnprajvca ( JVCA Partners [Business Share]: M/S. Nipa Enterprise [51.000%] , M / S R.A. Traders [49.000%] )
   R.F Classic Point (1st Floor), 8, Katalgonj Road (Beside Oli Kha Mosque), Chawkbazar, Chittagong
برائے مہربانی اس بات کو نوٹ کیجیئے کی یہ نوٹس آپ کی معلومات کے لیئے ہے
ہم اس بات کی حت المکان کوشش کرتے ہیں کہ ہماری ویب سائٹ پر سب سے صحیح اور تازہ معلومات فراہم کریں، لیکن ہم اس بات کی ضمانت نہیں دے سکتے کی تمام معلومات غلطی سے پاک ہیں۔
اگر اس نوٹس کے لیئے نئی/تصحیح کے بارے میں آپ کی کوئی رائے ہوں، برائے مہربانی ہمیں ضرور بتائیں۔